What are the requirements for the installation site of nitrogen production equipment

When it comes to nitrogen generators, everyone must be quite familiar with them, because nitrogen generators are widely used in many industries in society. So what are the requirements for the installation site and environment when installing a nitrogen generator? Below, the editor of the nitrogen generator will give a brief introduction to users.56_副本

The deployment of each equipment of the nitrogen generator shall be connected and deployed according to the process flow in sequence. The user needs to provide a dimensional diagram of the equipment installation plant and the location of the air inlet and nitrogen outlet of the formed item. Based on the essential site conditions, plan the deployment and connection diagram of the entire nitrogen making machine equipment.

The nitrogen generator system equipment usually does not have basic site requirements, as long as the factory building is flat and flat, it can meet the installation conditions. But for larger specifications of air compressors, compressed air drying equipment, etc., practice according to the manufacturer’s requirements. For the sake of equipment maintenance, cleanliness, and simplicity, it is best to make a flat tabletop 10cm above the ground at the placement position of the air compressor, drying equipment, nitrogen generator, and nitrogen purification device.

Each equipment is usually deployed along the walls of the factory building. The air compressor and refrigerated dryer should be placed at the air inlet or in a well ventilated area. If there is no air storage tank after the air compressor, the distance between the air compressor and the refrigerated dryer should be as large as possible, and the length of the pipeline between the two should be as long as possible to reduce the temperature of the contracted air through the atmospheric environment. The distance between each device should be at least greater than 1m, and the distance between each device and the wall should be at least greater than 0.8m. The control surface of the equipment should face the direction where personnel can easily operate it, making it easy for users to operate, care for, and inspect the equipment.

The pipeline connection between devices is determined by the essential condition of the equipment after it is in place. It is recommended that the pipeline connection be manufactured by the user according to their needs. All pipelines are connected using hard connections (threaded or welded) and constructed by specialized personnel to prevent leakage.

After all process equipment is in place, the pipelines between the equipment will be matched according to the actual situation on site. All pipelines are connected using hard connections (threaded or welded) and constructed by specialized personnel to prevent leakage. The pipeline between the nitrogen outlet of the formed item and the gas consumption point should be connected using copper or stainless steel pipes (new galvanized pipes should be used), and welding methods should be used. Power supply and cooling water shall be led to the equipment site, and distribution boards and cooling water supply facilities shall be prepared.